# Lets keep building! August 2021

August 31, 2021

### **August 2021**

‍ **Light Rail Mobility**  
When we say we're on the light rail, we mean it. The Cocina Chiwas frame is a 1 minute walk from the light rail stop.

‍ **Concrete grease trap install**  
Today, we placed a 21,000 pound underground concrete grease trap. All the excess grease from Cocina Chiwas will collect in this trap so they don't cause blockages in the new wastewater line we installed. This also eases the treatment of wastewater for future repurposing.

**Wood frame roof trussers install**  
Our first wood frame roof trusses are on Cocina Chiwas. They compose the core of the roof. All the mechanical equipment that will supply fresh cold air and remove exhaust from the kitchen ovens will lay on top of these trusses, as will our natural metal roof panels.