**Surveying & Staking for The Hub**  
We've started construction for The Hub. This unique building will include a coffee shop operated by our local partner Firecreek Coffee, a co-working space, a bike shop, and 28 residential units on top.

**Footers Dig Work for The Hub**  
Foundation work for The Hub is underway. These trenches will provide a strong foundation to The Hub's building envelope and the second set of residential units that will sit on top of it.

**Plumbing Install for Culdesac's 1st Phase of Residential-Only Blocks**  
We have begun underground work for Culdesac's first residential block storm drain system. These pipes will help direct and control the distribution of storm runoff around our apartments in Block F1.